ACH Clifford specialise in educational facilities & have built over 50 schools all over NSW. These projects have included new schools on greenfield sites through to minor refurbishments in existing schools. Delivered on a Design, Development & Construct basis through to Construct Only.
|
|
BRISBANE WATERS COLLEGE:
Umina Campus - Stages I & II
Stage I.New performance hall and workshop (1200m2), covered outdoor learning area, outdoor learning structures, games court, road works and soft landscaping. This was a fully operational campus through out the construction period. Larger construction initiatives strategically planned to coincide with the school holiday periods
Stage II. This project consisted of several separate milestones. The work comprised the design & construction of a new administration building, the refurbishment of the existing administration into new staff rooms, new car park & associated landscaping.
ACH Clifford worked in close cooperation with the school to avoid disruption to the activities of this fully operational school. Milestones were reworked to suit.
back to top > |
|
 |
|
BRISBANE WATERS COLLEGE:
Woy Woy Campus - Stages I & II
Stage I. Design Development & Construction of a new administration building and conversion of existing administration block to classrooms. Construction of two new car parks, and upgraded electrical supply to school. Fully operational campus through out the project. Removal of hazardous materials within the confines of an operating school
Stage II.The works included design development & additions to the existing performance workshop to create a state of the art space for the school’s music & drama curriculum. The refurbishment of commercial teaching kitchen & canteen & extensive landscaping, including the creation of an outdoor amphitheatre.
back to top >
|
|
 |
|
TUGGERAH LAKES COLLEGE:
The Entrance Campus - Stage II
Work here involved the refurbishment of 10 classrooms in a classroom block where the remaining classrooms were still in use. Provision of new science lab, computer labs & dance studio with timber sprung floor.
back to top >
|
|
 |
|
TUGGERAH LAKES COLLEGE:
Tumbi Umbi Campus - Stages II
Work comprised the design development & construction of the extension to a double storey fully operating classroom block, providing computer labs & general learning areas. Site works included associated landscaping & road works.
back to top >
|
|
 |
|
TUGGERAH LAKES COLLEGE:
Berkeley Vale Campus - Stages I & II
Extension to the existing library. The refurbishment of 2 occupied staff rooms. Was programmed to be completed during holiday periods so there was minimal disruption to staff.
back to top > |
|
 |
|
AUBURN WEST PUBLIC SCHOOL
Construction of new classroom blocks. The refurbishment of existing heritage classroom block into an administration area, & the construction of a new communal hall with covered outdoor learning area and extensive site works.
back to top >
|
|
 |
|
CARLTON PUBLIC SCHOOL
This project consisted of the Design & Construction of a new Communal Hall, covered outdoor learning area & site works to compliment the new construction.
back to top >
|
|
 |
|
HARBORD PUBLIC SCHOOL
Refurbishment of several classroom blocks, including an extensive double storey linkway, new canteen building, covered outdoor learning area & toilets, car parking, completed over several Milestones to allow for minimal disruption to the fully operational school. Work was completed 2 months ahead of contractual completion.
back to top >
|
|
 |
|
HELENSBURGH PUBLIC SCHOOL
This project involved the design development & construction of a communal hall & extensive civil & landscaping work. The hall was to be built on a steeply sloping site, with difficult access & required extensive excavation in rock. Working with our design team enabled ACH Clifford to come up with a solution whereby rock breakers were bought onto site , thus allowing the excavated material to be recycled & used on site , rather than disposal.
back to top >
|
|
 |
|
THE ENTRANCE PUBLIC SCHOOL
Stages I & II
ACH Clifford completed both Stage 1 & 2 redevelopment projects, including construction of new communal hall, 2-storey classroom blocks, canteen toilets, refurbishment of administration, new lift, games courts, hard & soft landscaping.
back to top >
|
|
 |
|
VARIOIUS PRESCHOOLS
Three separate projects entailed the upgrade of over 30 different preschools across the Sydney area. The scope of works included the initial survey of each school to determine the scope of works required to bring each site up to mandatory codes & standards. Construction was carried out in operational preschools & procedures & protection of preschool age children was of the utmost importance.
back to top >
|
|
|